Row River Road Culvert Replacement Project

Project Description and Location

This project replaced four culverts under Row River Road. The culverts had collapsed and needed to be replaced to avoid further risk to the road. If left unrepaired, the collapsed culverts would have led to long-term closures. Most of these culverts are buried 40 feet underground, which required major construction and total road closures to fix.

Closure Sites

The map on this page highlights each construction phase using a different color to note where each phase is located:

  • Phase One at milepost 5.96 is shown with the blue dot.
  • Phase Two at milepost 7.02 is shown with the red dot.
  • Phase Three at milepost 7.37 is shown with the green dot.
  • Phase Four at milepost 8.72 is shown with the purple dot.

Construction Dates

 Phase  Location Closed Open
 Phase 1   MP 5.96  5/20  6/17
 Phase 2  MP 7.07  6/17  7/23
 Phase 3  MP 7.37  7/23  8/30
 Phase 4  MP 8.72  8/29  9/30


Visit TripCheck for live updates.